Air-Cooled Chillers, Cooling Towers, RTU’s, AHU’s, VRF Units & OA Louvers
The Disastrous Effects of Deferred Maintenance by David Tod Geaslin *
The penalty for a failure (deferred maintenance) is not more, not twice as much, not four times as much, but that the real penalty for deferring maintenance that becomes a breakdown event is 15:1 minimum and often exceeds 40:1!